Been steadily chipping away at the wagon's projects.
Done:
-euro headers/cats
-new pre cat o2s
-radiator/thermostat/water pump/piping/expansion tank
-rebuilt fuel injectors
-head gasket
-secondary air pump delete
-M3 MK60 swap
Left to go:
-rod bearings
-clean ICV
-reassemble airbox area stuff
-euro tune. Probably a PC tune on that, once Brexit drives the gbp down.
-ecu fan
-all fluids
Feels like I'm almost done! Should be wrapping it up just in time for spring